Research project title Focus Area 5

Development of packaged design and integrated demonstration technologies for oil production plants

Vision

Through securing unconventional resource development and production capabilities

Establishing a foundation for entry into the oil and gas development upstream market

Project objectives

Packaging and integrated demonstration of core unconventional oil production and processing plant technologies

Development of commercial-scale design, construction, and operation technologies

Technology development Development of onshore drilling and production technologies
(Including ES-SAGD)
Demonstration technology Technology capabilities for drilling and production demonstration
(Track Record)
Market entry for developed equipment and services Expansion to less-developed, resource-rich countries

Research objectives and component technologies

Pre-FEED · Integrated demonstration

Component Technology 1
Oil production plant

Development of Pre-FEED technology

Site conditions and equipment specifications are surveyed, and process analysis is used to develop a design package. This links demonstration-scale design to analysis based on commercial-scale Pre-FEED.
01 Design data analysis 02 Model and process analysis 03 Preparation of design packages

Site conditions and equipment specifications are surveyed, and process analysis is used to develop a design package. This links demonstration-scale design to analysis based on commercial-scale Pre-FEED.

Research objectives · Based on the confirmed demonstration scale
Production plant design
  • 600 bpd
  • Pre-FEED, FEED, and detailed design technologies
  • Analysis and technology development based on commercial-scale 20,000 bpd Pre-FEED
Research activities and development scope
  • Determining specifications, capacities, and permitting requirements for developed equipment
  • Preparation and sharing of the integrated program schedule
  • Establishing an integration plan for component and core technologies (FEED package)
Component Technology 2
Oil production plant

Development of integrated demonstration technology

Developed equipment is fabricated as modules and packages, transported to an overseas site, and connected. Construction, operation, and evaluation establish field applicability and operational technology capabilities.
01 Module and package preparation 02 On-site assembly and construction 03 Integrated operation

Developed equipment is fabricated as modules and packages, transported to an overseas site, and connected. Construction, operation, and evaluation establish field applicability and operational technology capabilities.

Research objectives · Based on the confirmed demonstration scale
Integrated demonstration of the production plant
  • 600 bpd
  • Production plant construction and operation technologies
  • Locally tailored dissemination and deployment model
Research activities and development scope
  • Benchmarking overseas field validation and demonstration cases
  • Establishment of a field-application validation system and demonstration T/B
  • Operational evaluation and process optimization

Final research outcome targets and integrated framework

Packaging and demonstration of technologies from Focus Areas 1–4

  1. 01 Focus Area 1 ↗ Recovery and circulation
  2. 02 Focus Area 2 ↗ Fluid and fine-particle separation
  3. 03 Focus Area 3 ↗ Water treatment
  4. 04 Focus Area 4 ↗ Partial upgrading
Production plant packaging and integrated demonstration Design, fabrication, transport, construction, and operation

Field agreement, FEED execution, and T/B construction → Packaged equipment design, fabrication, and overseas transport → Construction and operation of a 600 bpd production plant

Phase 1

Domestic performance validation

Management and collaboration for Focus Areas 1–4 and performance testing using the domestic T/B

Phase 2

Overseas integrated demonstration

Construction and operation of the demonstration plant in Canada

Integrated demonstration support technologies

Operational diagnostics · Infrastructure construction · Environmentally sound processes

01

Diagnostic and monitoring system and digital twin

Equipment information is linked to a digital model to diagnose and monitor the demonstration plant's condition.
Equipment information is linked to a digital model to diagnose and monitor the demonstration plant's condition.
02

Rapid pipeline backfill construction and ground stability assessment

Pipeline backfill construction and ground stability are assessed together to support on-site infrastructure construction.
Pipeline backfill construction and ground stability are assessed together to support on-site infrastructure construction.
03

Fine tailings solidification process

Environmentally sound technology for solidifying fine tailings is addressed alongside production plant demonstration.
Environmentally sound technology for solidifying fine tailings is addressed alongside production plant demonstration.

Implementation strategy and direction

Phase 1 development and domestic validation → Phase 2 overseas demonstration

01

Development of component and core technologies

Development of component and core technologies
Phase 1 · Development and design
  • Demonstration field agreement and establishment of a local support system
  • Sharing specifications, capacities, and permitting requirements for equipment developed for the demonstration field
  • Support and collaboration in obtaining permits for developed equipment and demonstrations (Focus Areas 1–5)
  • Preparation and sharing of the integrated program schedule
  • Establishing an integration plan for component and core technologies (FEED package)
02

Pilot validation of prototypes

Pilot validation of prototypes
Phase 1 · Domestic validation
  • Performance evaluation and validation of prototypes from Focus Areas 1–4
  • Support for reliability certification of prototypes from Focus Areas 1–4
  • Establishing a coordinated cooperation system with government, relevant public institutions, and public corporations
  • Demonstration planning (site, scope, budget, and schedule)
  • Development of an integrated diagnostic and monitoring system for the demonstration plant
03

Overseas field demonstration

Overseas field demonstration
Phase 2 · Demonstration in Canada
  • Establishing a field-application validation system using a T/B
  • Modular and packaged equipment fabrication, transport, and construction
  • T/B development and demonstration plant construction and operation
  • Development of process analysis and conceptual design technologies for commercial-scale production plants
  • Development of a commercialization and deployment model for oil sands development tailored to overseas local conditions

Research activities and outcomes

Securing a field · Detailed design · Demonstration foundation

  1. 01
    Test bed demonstration field confirmed for the unconventional oil production plant: Sawn Lake (Andora Energy, Alberta, Canada)
  2. 02
    Building an expert network with Canadian provincial governments and relevant organizations
  3. 03
    Integrated detailed design completed for a 600 barrel/day oil sands production plant
  4. 04
    Establishing an integrated process for demonstration test bed construction and operation

AS-IS / TO-BE

Packaging · On-site demonstration · Process optimization

Transition 01

Site conditions and construction

AS-IS
  • Production plant construction faces substantial uncertainty, as local environmental conditions may disrupt implementation relative to plan
TO-BE
  • Packaged design, fabrication, and construction of distinct plant modules
  • Simplifying on-site work
Transition 02

Integrated performance and field demonstration

AS-IS
  • Validation in a single pilot is limited in scale, operating variables, and other aspects
  • Packaged design is important for securing the overall performance of multiple process units and resolving problems
TO-BE
  • Demonstration of oil production, processing, recirculation supply, and infrastructure construction technologies under field conditions
Transition 03

Process optimization and commercialization

AS-IS
  • Equipment for high-viscosity crude oil production processes has region-specific characteristics because it is designed for unconventional oil environments
  • Numerous regional constraints on production and marketing
TO-BE
  • Process optimization considering environmental and infrastructure conditions
  • Considering capital cost reduction and commercialization in unconventional oil regions